Update: May 6 and Nov 20 NOI Release Monitoring Data
Posted on Apr 19, 2024 in Red Hill Bulk Fuel Storage Facility
-
May 6 and Nov 20 2021 Cumulative Groundwater Data Table – 08 APR 24
-
NOI sampling results:
Soil Vapor Monitoring
- Cumulative Soil Vapor Monitoring Results for Tanks – 13 FEB 24
- Data table (Received on 2/21/22 posted on 2/22/22)
-
ADIT 3 Soil Vapor Results & Rain Gauge –29 DEC 23
-
SVMP Field Notes – 02 APR 24
-
Summa Canister Sampling
Monitoring Well Headspace PID Readings and Fuel Product Gauging
-
Cumulative SVMP PID Readings – 02 APR 24
-
Cumulative Headspace PID and Gauging – MAR 2024
-
Groundwater sampling field parameters are included in a third tab
-
ADIT 3 – Cumulative SVMP PID Readings- 12 MAR 24
-
- Cumulative Oil Water Int – 26 MAR 2024
Red Hill Shaft Gauging – 02 APR 24
May 6 and Nov 20 2021 Cumulative Groundwater Data Table – 08 APR 24
Final Cumulative Groundwater Data Table Tabulated – 08 APR 24